Our Blog
Industry insights, company news, and expert knowledge from the Ramos Industries team.

How to Prequalify a Glazing Subcontractor
A GC's checklist to prequalify a commercial glazing sub: license, insurance, W-2 crews, system experience, AAMA/ASTM test track record, and warranty.

Commercial Glazing Lead Times in SoCal by System (2026)
2026 commercial glazing lead times in Southern California by system, storefront, curtain wall, unitized, IGUs, and specialty glass, plus what drives delays.

Seismic and Deflection Requirements for SoCal Curtain Wall
Seismic drift and deflection requirements for Southern California curtain wall, AAMA 501.4, L/175 limits, glass bite, and detailing for inter-story movement.

2025-2026 California Energy Code Changes Affecting Glazing
How the 2025-2026 California Title 24 energy code affects commercial glazing, U-factor, SHGC, VT, NFRC ratings, and what spec-writers should plan for.

Aluminum Storefront Systems Compared (Center-Set, Offset, Flush)
Center-set vs. offset vs. flush aluminum storefront, glazing plane, sightlines, water management, and where each system fits. Spec guidance for GCs.

Spandrel Glass and Aluminum Composite (ACM) Panel Integration
How spandrel glass and ACM panels integrate in curtain wall and storefront facades, back-pan vs. opacified options, thermal, fire, and spec guidance.
We use cookies and similar technologies to improve your experience on our website.